Primeline Installation: How to Install Primeline Newport, Chamfer, and Heritage Cladding

Primeline Installation: How to Install Primeline Newport, Chamfer, and Heritage Cladding

Primeline Cladding, another outstanding product made from fibre cement, offers an aesthetically pleasing and durable solution for various types of exteriors. This guide will walk you through the installation process.

Note: Always follow the manufacturer's guidelines and adhere to local building codes. Consider hiring a certified professional for installation.

You can find a copy of the technical specifications brochure on the following link.

Required Tools and Materials

  • Primeline Cladding Panels
  • Compatible fasteners
  • Measuring tape
  • Spirit level
  • Circular saw with a diamond-tipped blade
  • Cordless drill
  • Caulking gun
  • Sealant and weather barrier
  • Safety gear (gloves, goggles, dust mask)

You can find our range of Primeline Cladding (including Heritage, Newport, and Chamfer) and accessories here.

 

Pre-Installation Steps

  1. Wall Inspection: Ensure that the substrate is even and free from defects.
  2. Weather Barrier: Apply a suitable weather barrier as per manufacturer guidelines.

Installation Steps

Step 1: Establish a Starting Point

Using a spirit level, mark a level starting point for your first row of panels.

Step 2: Cut Panels

Cut the Primeline cladding panels to size using a circular saw equipped with a diamond-tipped blade.

Step 3: Apply Weather Barrier

Apply a secondary weather barrier or sealant as recommended by the manufacturer.

Step 4: Panel Placement

After installing the starter strip, place the first panel on your starting point and make sure it's level before securing it with fasteners. A great video on installing the starter strip and first planks can be found here.

Step 5: Continue Installing

Install the remaining panels, ensuring the fasteners are placed at recommended intervals and depths as per manufacturer guidelines.

Step 6: Joints and Corners

Seal all joints and corners with the appropriate sealant, making sure to smooth out any excess for a clean finish.

Step 7: Final Check

Review the installation to ensure all panels are secure and that the facade is visually appealing.

 

Differences Among Primeline Profiles

Primeline Cladding comes in different profiles like Heritage, Newport, and Weatherboard. The main differences often lie in the aesthetic appearance, but installation steps are generally similar for all three. However, always consult specific guidelines for each profile to ensure correct installation.

 

Tips and Tricks

  1. Panel Alignment: Always double-check that each panel is level before moving on to the next.
  2. Sealant Application: Apply sealant in a consistent manner to avoid unevenness or gaps.
  3. Optimize Cuts: Plan your cuts carefully to minimize waste.
  4. Safety First: Always prioritize safety by wearing the appropriate gear.

By closely following this installation guide, you will find that Primeline Cladding not only enhances the aesthetic value of your property but also offers a long-lasting solution against weather elements.

 

Back to blog