Villaboard Installation - How to Install Villaboard Lining

Villaboard Installation - How to Install Villaboard Lining

Villaboard lining, is a versatile building material used for interior and exterior wall cladding, wet area linings, and as a substrate for tiles. Its durability, moisture resistance, and versatility make it a popular choice in construction. In this guide, we will walk you through the steps to install Villaboard lining, with specific recommendations for both general and wet area installations, as well as some handy tips and tricks.

 

 

The Villaboard technical specifications brochure can be found here:

 

Materials and Tools You'll Need:

Before you begin, gather the necessary materials and tools:

  • Villaboard sheets
  • Appropriate screws (as recommended by the manufacturer)
  • Villaboard adhesive or joint sealant
  • Circular saw with a carbide-tipped blade
  • Screw gun or drill
  • Spirit level
  • Carpenter's square
  • Tape measure
  • Safety gear (gloves, safety glasses, dust mask, and ear protection)
  • Waterproof membrane (for wet areas)
  • Waterproof joint tape (for wet areas)
  • Notched trowel (for adhesive application in wet areas)

You can view our range of Villaboard products and accessories here.

 

Installation Steps:

General Installation:

  1. Prepare the Surface: Ensure the wall or substrate is clean, dry, and free of protruding nails or screws.

  2. Measure and Mark: Measure and mark the desired sheet dimensions on the wall, ensuring the sheets will be properly spaced and level.

  3. Cutting: Use a circular saw with a carbide-tipped blade to cut the Villaboard sheets to size. Make sure to wear safety gear when cutting.

  4. Attach Villaboard Sheets: Secure the sheets to the wall or substrate using appropriate screws. Ensure the screws are evenly spaced along the edges and field, and that they penetrate the studs or substrate adequately.

  5. Sealing Joints: Apply Villaboard adhesive or joint sealant to the joints and edges of the sheets to create a waterproof and airtight seal. Feather the edges to create a smooth transition.

Wet Area Installation:

  1. Waterproof Membrane: In wet areas such as bathrooms, apply a waterproof membrane to the substrate before installing Villaboard. Follow the manufacturer's instructions for the membrane application.

  2. Villaboard Installation: Secure the Villaboard sheets to the waterproofed substrate using screws. Ensure the joints between the sheets are staggered and do not align with the joints in the substrate.

  3. Sealing Joints: Apply a waterproof joint tape over the seams and joints of the Villaboard sheets. Coat the tape with Villaboard joint sealant using a notched trowel, ensuring a watertight seal.

Tips and Tricks:

  1. Smooth Cuts: To achieve clean and smooth cuts, make sure your circular saw blade is sharp. Use a straight edge or cutting guide for precision.

  2. Proper Spacing: Maintain the recommended spacing between screws (typically 150mm along the edges and 200mm in the field) to secure Villaboard sheets adequately.

  3. Adhesive Application: When applying adhesive or joint sealant, work in small sections at a time to ensure it doesn't dry before you can smooth it out.

  4. Stagger Joints: Stagger the joints between sheets to create a stronger and more stable surface.

  5. Prevent Over-Tightening: Be cautious not to over-tighten screws, as this can cause the Villaboard to crack. Use the recommended screw depth.

  6. Double-Check Level: Continuously check for level and plumb as you install sheets, making adjustments as needed to ensure a straight and even finish.

 

Installing Villaboard lining requires attention to detail and proper preparation, especially in wet areas where waterproofing is critical. Following these steps, recommendations, and tips will help you achieve a successful and long-lasting installation, whether for general or wet area applications.

Back to blog